Evidence
Past Performance
Sanitized snapshots of the work behind our claims: the challenge, what we did, and what changed as a result.
DOD-Funded Program
System migration and sustained operations
Challenge
A legacy environment requiring migration without disrupting mission operations, followed by ongoing sustainment under cost pressure.
What we did
Planned and executed the migration inside a constrained maintenance window, then assumed operations and maintenance for the system.
Results
-
Under 4 hours of planned downtime
-
Zero data loss during migration
-
99.9% availability sustained across the O&M period
-
~20% reduction in sustainment costs
Non-Profit
Managed IT services across multiple sites
Challenge
Roughly 150 users across three sites without dedicated internal IT, facing slow issue resolution and rising operating costs.
What we did
Took over managed services end to end: proactive monitoring, tiered help desk, patch management and asset lifecycle.
Results
-
99.9% uptime across ~150 users and 3 sites
-
~40% faster ticket resolution, now under 2 hours
-
~30% reduction in IT operating costs
Federal Civilian Agency
Systems consolidation and executive reporting
Challenge
Six disconnected systems with no unified view, taking ~5 days to produce executive reporting and ~30 hours of manual work each month.
What we did
Consolidated the six systems into a single AI/ML-enabled platform with a leadership reporting hub.
Results
-
6 systems into 1 AI/ML-enabled platform
-
Executive reporting from ~5 days to under 1 hour
-
~30 hours of manual reporting eliminated monthly
